Tuesday, November 15, 2011

Week 14 Report

AT LAST what needs to be done is done!
Everything went smoothly except for the final render which wasn't good because I didn't know that exporting as ".mov" (compressed) from after effects would affect the quality of my animation that later on I also edited it in Premier which was worse when render out again. The sound need to be export separately as ".wav" and for the animation as "TGA" plus a preview "Mpeg2", instead of doing all that I rendered my animation as a single file "MP4" then burned it on disc, but it wasn't the right format for the submission said Jack. So Jack helped me to get the right format and re-render it again before Friday. Later on that day i got my animation rendered and being submitted on Friday. That was the last challenge I guess!
Throughout the year of working on a minor project I've learned a lot, the boring bits, frustrated bits, and lots of fun bits but what important is that my Major Project for next year is going to be an awesome animation!

Wednesday, November 2, 2011

Production Journal Review (Week 12)

This is week 12 and I'm very happy where I'm at, the animation is locked up by Friday (end of week 12) and ready for some rendering actions over the weekend. Just a few days before that I was experiencing the files being corrupted but I managed to re-do it because I still had some backups at home. So I'll have 2 weeks for rendering and editing, I guess I somehow following schedule even though I hardly check it. The rendering properly takes no longer than 24 hours so that can be done over the weekend and hopefully it'll go smoothly. For the sound design, I have just recorded a bunch of sound such as (screaming) voice of "Jarrod" and recording technician "Josie". I found some free sounds FX online but it's better to record my own because it'll synchronise with my animation better! Overall I think I'm not falling behind or ahead according to the deadline but at least I'm not stressing out. So far everything goes well! :)

Thursday, October 27, 2011

Thursday, October 20, 2011

GHOSTs in the machine




BAD NEWS: When i try to re-open the maya file that i saved earlier today then this message pops out.. The file is corrupted and I can't do anything about it. So all the works i did today are "Gone with the Wind" hurray!!! :((


GOOD NEWS: I still have the backup @ home and I have to do it again. Sighs...!!! (not much though) :

Wednesday, October 19, 2011

Tuesday, October 18, 2011

WEEK 10: Production Journal Reviews

Over 2 weeks break I continue animating and thought I've done fair amount of works, so I estimated 70-80% of animation but NOOOO! after Jack checked it, now I'm down to 50% :( Anyway I think I got the point, after Jack checked it I see lots of things that can work so much better such as anticipation, timing right, energy etc.
Right now I'm fixing up the timing and getting rid of the floating in my animation. So far I'm quite happy where I'm at now and with all the advises from Jack I'm pretty confident to do it by myself.
I keep focusing on animating and almost forgot about sound design. For sound I haven't done anything except that rough sound design in my animatic long time ago (but that gives me an idea of what my final sound design would be like) so I reckon this week I'll spend a little more time on sound design.
Oh yeah and the textures too! I might come up with the new textures for my Hungry Bunny and the Planet after finish animating.

Thursday, September 22, 2011

WEEK 8: Production Journal Reviews

According to the schedule now is the time that I should started animating. After everything ready by week 7 I started doing the key pose until now. So far so good, now I'm catch up! even though when I look at my production over again, I see lots of mistakes and problems. But I did expecting that to happen and get stuff up, so that the next major project I can do it better.
Right now I'm still getting use to the timeline in maya (linear, tangent, graph editor ect..) I find it a bit confuse even though it seems easy when Jack did it. I want to finish the key-pose by the end of this week but I have to give sometime on other subjects which due this Friday as well. So I decided I'll keep animating through the holiday and "hopefully" I'll able to get it done when uni resumes. If i get it done early I will have time to perfect it plus extra time to render!
And the sound as well, I didn't spend enough time for the sound, until now all I have done is the rough sound track. If lucky enough I'll get it done over the holiday too.
Finally the biggest problem of them all "MOTIVATION"